The government has identified many potential sites that will be developed into power generating plants in the future. Listed in the table below are some of these sites that have been identified by the government.

No.

PROJECT NAME

CAPACITY (MW)

CURRENT PROJECT STATUS

1

Chasombo hydro power site

50

IPP in place and conducting FS

2

Mpatamanga hydropower site

300

Spill way model testing in progress. PPP arrangement in progress

3

Chizuma hydropower site

40

IPP in place and conducting FS

4

Chimgonda hydropower site

50

Pre-feasibility study done

5

Lower Fufu hydropower site

140

Feasibility study and detailed designs done

6

Kholombidzo hydropower site

200

Feasibility study in progress

7

Songwe River hydropower

90

Detailed designing & tender documents done

8

Mbongozi

41

PPA signed between IPP and Utility

9

Tedzani IV

22

Construction in progress

10

Nkula A Upgrade

12

Upgrades done

11

Tedzani III Upgrade

10

Procuring EPC contractor

12

Kamwamba Coal-fired

300

Financing stage

13

Bagasse Cogeneration

51

Financing stage

14

Diesel power plants

78 

Power Generation in progress

15

Geothermal power generation

> 500 

Pre-feasibility study  completed

16

Wind power generation

> 200 MW

Resource mapping completed

17

Solar power generation

> 200 MW

Resource mapping completed

18

Mozambique – Malawi (400kV

300 MW

Procurement of contractor

19

Zambia – Malawi 330kV

 

MOU Signed. Feasibility Study in progress

20

Tanzania – Malawi

 

Feasibility study in progress